{"id":1617,"date":"2025-09-08T08:00:40","date_gmt":"2025-09-08T08:00:40","guid":{"rendered":"https:\/\/oraexacta.net\/blog\/?p=1617"},"modified":"2025-09-08T08:00:44","modified_gmt":"2025-09-08T08:00:44","slug":"electroalfa-international-deruleaza-contracte-in-valoare-de-peste-145-milioane-euro","status":"publish","type":"post","link":"https:\/\/oraexacta.net\/blog\/2025\/09\/08\/electroalfa-international-deruleaza-contracte-in-valoare-de-peste-145-milioane-euro\/","title":{"rendered":"Electroalfa International deruleaz\u0103 contracte \u00een valoare de peste 145 milioane euro"},"content":{"rendered":"\n<p>Electroalfa International, companie cu capital 100% rom\u00e2nesc \u0219i o experien\u021b\u0103 de peste 34 de ani, deruleaz\u0103 \u00een prezent contracte \u00een valoare de peste 145 milioane euro, \u00een domenii esen\u021biale pentru economia na\u021bional\u0103: energie, transport, rafinare, reziden\u021bial, industrial \u0219i iriga\u021bii. Proiectele includ produc\u021bia \u0219i livrarea de echipamente electrice, lucr\u0103ri de proiectare, montaj \u0219i integrare \u00een sisteme digitale de control \u0219i automatizare.<\/p>\n\n\n\n<p>Printre proiectele majore aflate \u00een desf\u0103\u0219urare se num\u0103r\u0103 contribu\u021bia la lucr\u0103rile de modernizare tehnologic\u0103 de la Rafin\u0103ria Petrobrazi, precum \u0219i livrarea de echipamente pentru infrastructura electric\u0103 aferent\u0103 Autostr\u0103zii Moldovei (A7).<\/p>\n\n\n\n<p>La T\u00e2rgu Jiu, compania este implicat\u0103 \u00een extinderea \u0219i modernizarea re\u021belei de distribu\u021bie a energiei electrice, iar \u00een sta\u021bia de transformare 110\/20 kV Dr\u0103g\u0103\u0219ani deruleaz\u0103 lucr\u0103ri de reabilitare complet\u0103 \u0219i integrare \u00een sistemul SCADA.<\/p>\n\n\n\n<p>\u00cen jude\u021bele Mehedin\u021bi \u0219i Giurgiu, Electroalfa International contribuie la modernizarea infrastructurii de iriga\u021bii prin reabilitarea sta\u021biei de pompare \u0219i a canalelor de la Crivina, respectiv prin lucr\u0103ri complexe \u00een zonele A, B \u0219i C din Giurgiu. De asemenea, la Horezu, compania deruleaz\u0103 lucr\u0103ri de reabilitare a sta\u021biei electrice \u0219i a re\u021belelor de distribu\u021bie de 20 kV.<br>Aceste proiecte confirm\u0103 capacitatea Electroalfa International de a livra solu\u021bii tehnice integrate pentru infrastructura critic\u0103, cu aplicabilitate direct\u0103 \u00een re\u021bele strategice pentru economie. Beneficiile acestor lucrari se vor resim\u021bi direct \u00een comunit\u0103\u021bi, prin modernizarea infrastructurii energetice \u0219i cre\u0219terea siguran\u021bei \u00een alimentarea cu energie \u0219i ap\u0103 pentru agricultur\u0103.<\/p>\n\n\n\n<p>\u201eAm construit un ecosistem opera\u021bional capabil s\u0103 func\u021bioneze la scar\u0103 industrial\u0103, dar cu grij\u0103 constant\u0103 fa\u021b\u0103 de specificul fiec\u0103rui proiect. Performan\u021ba se cultiv\u0103 pe o funda\u021bie solid\u0103 de disciplin\u0103, expertiz\u0103 \u0219i parteneriate durabile. Rezultatele sunt cu adev\u0103rat relevante doar atunci c\u00e2nd genereaz\u0103 dezvoltare real\u0103, a re\u021belelor, a comunit\u0103\u021bilor \u0219i a industriei rom\u00e2ne\u0219ti\u201d, a declarat \u0218tefan Petrea, Director General, Electroalfa International.<\/p>\n\n\n\n<p>Electroalfa International a \u00eencheiat anul 2024 cu o cifr\u0103 de afaceri de peste 134 milioane euro, \u00eenregistr\u00e2nd o cre\u0219tere de circa 3,5 ori comparativ cu 2020, conform raport\u0103rilor contabile realizate \u00een baza Standardelor Rom\u00e2ne\u0219ti de Contabilitate (RAS). Cre\u0219terea a fost sus\u021binut\u0103 de consolidarea proiectelor \u00een infrastructura energetic\u0103 \u0219i extinderea activit\u0103\u021bilor de export.<\/p>\n\n\n\n<p>Electroalfa International este o companie cu capital 100% rom\u00e2nesc, recunoscut\u0103 ca unul dintre principalii juc\u0103tori \u00een domeniul echipamentelor electrice de medie \u0219i joas\u0103 tensiune, al lucr\u0103rilor te tip EPC ((Engineering, Procurement, Construction) \u0219i al solu\u021biilor de eficien\u021b\u0103 energetic\u0103. Cu o experien\u021b\u0103 de peste 34 de ani \u0219i un angajament constant fa\u021b\u0103 de cercetare-dezvoltare, digitalizare \u0219i inova\u021bie, Electroalfa International este activ implicat\u0103 \u00een modernizarea infrastructurii critice, \u00een domenii precum distribu\u021bia de energie, transportul feroviar, industria nuclear\u0103 \u0219i energia regenerabil\u0103.<\/p>\n\n\n\n<p>Compania de\u021bine patru unit\u0103\u021bi de produc\u021bie moderne, cu o suprafa\u021b\u0103 total\u0103 de 25.500 mp, un centru propriu de cercetare-dezvoltare \u0219i colaboreaz\u0103 cu peste 500 de clien\u021bi la nivel na\u021bional \u0219i interna\u021bional. Prin integrarea proceselor de produc\u021bie, inginerie \u0219i execu\u021bie, Electroalfa este un partener de \u00eencredere pentru proiecte cu impact major \u00een infrastructura energetic\u0103 european\u0103.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Electroalfa International, companie cu capital 100% rom\u00e2nesc \u0219i o experien\u021b\u0103 de peste 34 de ani, deruleaz\u0103 \u00een prezent contracte \u00een valoare de peste 145 milioane euro, \u00een domenii esen\u021biale pentru economia na\u021bional\u0103: energie, transport, rafinare, reziden\u021bial, industrial \u0219i iriga\u021bii. Proiectele includ produc\u021bia \u0219i livrarea de echipamente electrice, lucr\u0103ri de proiectare, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1618,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,2],"tags":[],"_links":{"self":[{"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/posts\/1617"}],"collection":[{"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/comments?post=1617"}],"version-history":[{"count":1,"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/posts\/1617\/revisions"}],"predecessor-version":[{"id":1619,"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/posts\/1617\/revisions\/1619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/media\/1618"}],"wp:attachment":[{"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/media?parent=1617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/categories?post=1617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/oraexacta.net\/blog\/wp-json\/wp\/v2\/tags?post=1617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}